2026W39

Bow & Bridge 21–27 Sep 2026

A facsimile is not a second edition

Commits
15
In this project
Week 7 of 7
ISO week
2026-W39

13 commits to Bow & Bridge from Mon 21 Sep to Wed 23 Sep 2026. A short week of corrections found by reading the live site. The biggest: a facsimile reprint had been counted as a second, independent edition, which let 105 maker records publish on what was really one book. Those 105 went back to draft, and the deploy chain learned to carry a retirement through to production.

  • Added /labels/: every checked maker’s label on a published record, A to Z, with the book, scan page and line it was read from.
  • Fixed the edition rule: a facsimile counts as the edition it reproduces. 105 records resting on one reprinted book were demoted to draft, and 583 same-person questions were answered in the same pass, leaving 569 published makers.
  • Fixed the OCR loop check, which had rejected 1,019 honest pages across 429 volumes because a row of dot leaders looked like a decoding loop.
  • Made ‘take these down’ mean a named list rather than everything, and fixed the deploy so a retirement actually reaches production and a failed outside gate no longer rolls the whole release back.

Every week of Bow & Bridge